Definition :-
Industrial Building System (IBS) :
a construction system where components are manufactured at factories on or off site, transported and then
assembled into a structure with minimum work.
5 commonly used IBS types in Malaysia are:
- Precast concrete framing, panel and box systems.
- Steel framework systems.
- Prefabricated timber framing systems.
- Steel framing systems.
- Blockwork systems
Project Performance Monitoring System (PPMS) :
Project Performance Monitoring System (PPMS) that aims to assist project managers in exercising construction project control. With the aid of a panel of project management specialists, the following project performance measure categories are identified for inclusion in the PPMS: People, Cost, Time, Quality, Safety and Health, Environment, Client Satisfaction, and Communication. For each of the performance measure categories, performance indicators and their measurements are also established. The monitoring process is automated through the use of the World Wide Web and database technology. Data collection and dissemination are similarly automated. The use of the PPMS can help senior project management, project directors, project managers, etc., in monitoring and assessing project performance.Sai On Cheung(2004)
0 comments:
Post a Comment